Where the time actually goes
A lot of the granny flat project time is not construction. The build itself is 12-14 weeks; everything before it is design, testing, documentation and approvals. Where a planning permit is required, we run documentation alongside the council application rather than after it — which is where the shortest realistic timeline comes from.
7 Stages

48 Hours

$0 -First 2 Stages
.jpg)

12-14 Weeks on Site

The same seven stages on every project.
What happens, what it costs, and how long it takes.
Our Process
01
Consultation & advice
A conversation, not a sales pitch — by phone or in our Kilsyth South showroom.
-
Designs matched to your block
-
Desktop site assessment
-
Title, overlays and easements checked
-
An early read on council
Complimentary · 30–60 minutes
02
Project proposal
A written proposal in your hands within two working days.
-
Estimated construction cost
-
Your options and upgrades, priced
-
Statutory fees for your council
-
Provisional items marked as provisional
Complimentary · Within 48 hours
03
Design & site report
Your project becomes real, and the site gets tested properly.
-
Preliminary working drawings
-
Soil classification and wind rating
-
Site feature survey
-
BAL assessment where required
-
Your Construction Manager assigned
From $8,000 + GST · 3–7 weeks
04
Council permits
Not every site needs a planning permit. Where yours does, we handle the whole application.
Application lodged and managed
Land Capability Assessment
Bushfire or flood overlay reports
Arborist report where required
Planning approval secured
$4,000–$10,000 + GST, where required · 12–24 weeks
05
Specification, selection & documentation
The enjoyable part — where a plan turns into your home.
Colours, finishes and fixtures chosen
Final construction drawings
Specification schedule
Structural engineering
7-Star Energy Rating
From $7,500 + GST · Engineering $2,500–$4,000 · 5–10 weeks
06
Contract & building permit
Every inclusion, allowance and cost documented before you sign a thing.
HIA New Home Building Contract
Fixed inclusions and allowances
No open-ended items
Your building permit
A construction start date
5% deposit on signing · 2–8 weeks
​
Standard, not extra
Feature tiling, double-glazed windows, engineered flooring and a 7-star energy rating are standard across the range. Upgrades are named as upgrades, in writing, before you choose a thing.
.png)
07
Construction
Six inspected stages, one point of contact, and a progress claim at each.
Base — stumps and base complete
Frame — floor, wall and roof
Lock-up — roof, walls, windows, doors
Fixing — linings, cabinetry, fixtures
Practical completion and handover
Progress claims at each stage · 12–14 weeks on site

25 +
Years building
Built under a Domestic Builder Unlimited registration, backed by Katana Building Services and more than 25 years of residential construction across Melbourne's east, south-east and the Mornington Peninsula.
DB-U
.png)
Every stage ends with something in your hands
Building should feel like progress you can hold. Every stage ends with something real — a proposal, your drawings, the site report, the contract — and nothing moves forward until you've seen it and you're happy. You'll always know where your home is up to, and who to call.